ORBIT TOWERS PROJECT, Kohinoor Residential Towers - HT WORKS

Consectetur adipiscing elit sed do eiusmod tempor incididunt ut labore et dolore magna.

Why Powerline?

Powerline was chosen for its deep domain expertise, engineering reliability, and proven track record across industrial, government, and infrastructure projects.

Engineering Precision

In-house design & execution with minimal deviation

On-Time Delivery

Projects executed within agreed timelines

Safety First

Full compliance with project-specific safety standards

Collaborative Approach

Effective communication with stakeholders and consultants

Project Scope

SUPPLY & INSTALLATION OF BAY EXTENSION WORKS AT 132 / 33 KV KHAITHALAPUR SUB STATION WHICH INCLUDES GALAVANISED STEEL , TC & BD TOWERS, TOWER STUBS, WITH CONNECTORS, INSULATORS, ZEBRA CONDUCTOR , PC VCB WITH TWIN FEEDER CONTROL & RELAY PANEL , CT’S & PT’S, CIVIL WORKS AT SUB STATIONS AND 4 KM LINE WORK WHICH INCLUDES 8000 MTRS OF 400 SQ MM HT CABLE LAYING IN EXCAVATED TRENCH OF CC BT & HARD ROCK , RCC HUME PIPES LAYING IN EXCAVETED TRENCH , 150 MM DIA MS TUNNEL BORE GROUTING WORK AT RAILWAY CROSSING , WITH NECCESARY REQUIRED MATERIAL FROM 132/33 KV KHAITHALAPUR SUB STATION TO KOHINOOR SITE, DP STRUCTURE AND HT PANELS INSTALLATION AT KOHINOOR SITE PREMISES . CO – ORDINATION WITH DEPARTMENT OFFICIALS FOR SANCTION, POWER RELEASE , CEIG WORKS. OBTAINING TSIIC PERMISSIONS , GHMC PERMISSIONS.

Powerline was trusted with executing this project as part of our commitment to delivering safe, efficient, and high-quality electrical and solar infrastructure solutions. The scope involved precise execution tailored to the client’s operational and site-specific needs.

Project Highlights

Outcome & Impact

The project successfully enhanced the client’s operational capability and future readiness, contributing to a reliable and sustainable power infrastructure.

Case Study

Project Location

:

KHANAMET

Client

:

N/A

Year of Completion

:

2024

Duration

:

4 MONTHS

Need Assistence