SPINNMAX TYERS PVT LTD

Consectetur adipiscing elit sed do eiusmod tempor incididunt ut labore et dolore magna.

Why Powerline?

Powerline was chosen for its deep domain expertise, engineering reliability, and proven track record across industrial, government, and infrastructure projects.

Engineering Precision

In-house design & execution with minimal deviation

On-Time Delivery

Projects executed within agreed timelines

Safety First

Full compliance with project-specific safety standards

Collaborative Approach

Effective communication with stakeholders and consultants

Project Scope

SUPPLY & INSTALLATION OF BAY EXTENSION WORKS AT 132 / 33 KV KANDAWADA SUB STATION WHICH INCLUDES 4P STRUCTURE , PC VCB WITH CONTROL & RELAY PANEL , CT’S & PT’S, CIVIL WORKS AT SUB STATIONS AND 2.5KM LINW WORK WHICH INCLUDES SUPPLY & INSTALLATION OF M+6 , TOWERS , 11 MTR BOXPOLES ,STUBS, PITS EXCAVATION , 100 SQ MM CONDUCTOR LAYING, WITH NECCESARY REQUIRED MATERIAL FROM 132/33 KV KANDAWADA SUB STATION TO SPINMAX TYRES SITE, DP STRUCTURE OUT SIDE THE CONSUMER PREMISES , 8 POLE STRUCTURE INSIDE THE CONSUMER PREMISES AND AB SWITCHES, HT PANEL, METERING CUBICLE, INSTALLATION AT SPINNMAX SITE PREMISES . CO – ORDINATION WITH DEPARTMENT OFFICIALS FOR SANCTION, POWER RELEASE , CEIG WORKS. OBTAINING TSIIC PERMISSIONS , GHMC PERMISSIONS.

Powerline was trusted with executing this project as part of our commitment to delivering safe, efficient, and high-quality electrical and solar infrastructure solutions. The scope involved precise execution tailored to the client’s operational and site-specific needs.

Project Highlights

Outcome & Impact

The project successfully enhanced the client’s operational capability and future readiness, contributing to a reliable and sustainable power infrastructure.

Case Study

Project Location

:

CHEVELLA

Client

:

SPINNMAX TYERS PVT LTD

Year of Completion

:

2021

Duration

:

nan

Need Assistence